Milestones
2006
Sun Labs was established.
2011
• The first 125MW module
production line officially launched.
2016
• Established a production base in Vietnam.
• Obtained the “Pioneer” power degradation
certification in the first year.
2021
• Entered into the fields of photovoltaic mounting systems, energy storage, and hydrogen energy
• Ranked as the champion enterprise in the manufacturing sector in Hebei Province.
• Establishment of Sun Labs.
2023
• Provincial-level reliability laboratory put into operation.
• Establishment of a third-party verified base.
2008
- Mature R&D and technological capabilities
- Full entry into the photovoltaic industry
2013
• Listed in the Ministry of Industry and Information Technology’s PV manufacturing access list.
• Pass acceptance tests of Hebei Province Engineering Laboratory.
• Established partnerships with Sharp and BYD, fully expanding into the Japanese Market.
2017
• Entered into the photovoltaic power plant sector.
2022
• Entered into the wind energy sector.
• Officially entered into the TOPCon module field.
• Included in the sixth batch of green supply chains.