Milestones

2006

Sun Labs was established.

2011

• The first 125MW module
production line officially launched.


 

2016

• Established a production base in Vietnam.


• Obtained the “Pioneer” power degradation
certification in the first year.

2021

• Entered into the fields of photovoltaic mounting systems, energy storage, and hydrogen energy


• Ranked as the champion enterprise in the manufacturing sector in Hebei Province.

•  Establishment of Sun Labs.

2023

• Provincial-level reliability laboratory put into operation.

• Establishment of a third-party verified base.

 

2008

  • Mature R&D and technological capabilities
  • Full entry into the photovoltaic industry

2013

• Listed in the Ministry of Industry and Information Technology’s PV manufacturing access list.


• Pass acceptance tests of Hebei Province Engineering Laboratory.


• Established partnerships with Sharp and BYD, fully expanding into the Japanese Market.

2017

• Entered into the photovoltaic power plant sector.


2022

• Entered into the wind energy sector.


• Officially entered into the TOPCon module field.


• Included in the sixth batch of green supply chains.